96acc5c1

6.13.1.2. Replacement


Throttle case details

 

1 – additional air hose;
2 – hose of supply of cooling liquid;
3 – throttle cable;
4 – accelerator cable;
5 – EVAP hose;
6 – EGR temperature sensor;
7 – vacuum hose;
8 – laying;
9 – EVAP hose;

10 – throttle case;
11 – socket of the sensor of provision of a butterfly valve;
12 – EGR temperature sensor arm;
13 – EGR temperature sensor socket;
14 – IAC valve socket;
15 – air inlet hose;
16 – hose of supply of cooling liquid


PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.

Preventions

In the presence in the code radio receiver against theft, before a detachment of the accumulator check that you have connection codes.

On models since 1993 the system of the airbag of safety is disconnected if the accumulator is disconnected for long term. If a control lamp of a safety cushion it lights up and necessary to burn after repeated connection of the accumulator, it is necessary to address in a specialized workshop for maintenance of system.


2. Merge cooling liquid from a radiator.
3. Weaken collars and remove an air inlet hose. Disconnect an accelerator cable from a control lever a butterfly valve and an accelerator cable cover from the throttle case.
4. Mark and disconnect vacuum hoses and hoses of supply of cooling liquid from the throttle case.
5. Disconnect the electric socket from the sensor of provision of a butterfly valve.
6. Unscrew 4 bolts of fastening of the case of a throttle.
7. Remove the throttle case with laying from an inlet collector (see rice. Throttle case details).
8. Using a soft brush, clear the throttle case, then blow all channels compressed air.
9. Installation of the case of a throttle is made in the sequence, the return to removal.