96acc5c1

7.6.1. Installation

PERFORMANCE ORDER
1. Turn a distributor rotor so that the adjusting tag on a back part of a rotor was combined with an ukazata Lem on the distributor case. 2. Install the ignition distributor on the engine according to earlier put tags.
3. Further installation is made in the sequence, the return to removal. Check installation of a corner of an advancing of ignition.